16 December 2012Yemen LNG confirms the sabotage of the 38 inch gas pipeline that links the block 18 to the Balhaf terminal on the Gulf of Aden. The sabotage occurred at 00.35 hrs on 16th December, 2012 at 173 km north of Balhaf.
© 2013 - Yemen LNG Company. All Rights Reserved